Estimating guide ยท section 10 of 29
Review the cost build-up behind a price
Check what the price was built from: each cost line, its rate and markup, the target margin and the margin the quoted total really leaves.
Watch this in the video (0:21)
Steps
In the pictures, a numbered red box marks where to click or type. Where a picture has more than one box, the numbers give the order.
Select a worksheet row on the estimate. The Worksheets tab opens on it: each cost line with its rate, quantity and markup, and the total cost.

Use the chips at the top to see only this estimate's worksheets or all of them. Select Open estimate to go back to the estimate.

Tips
- A worksheet is the internal cost build-up, not the quoted total. Worksheets are read here; they are not edited on this tab.