IntraSync docs
Isa Takeoff: how-to guide
Isa Takeoff turns a prospective job into a priced quote in minutes. Type the structures in, import them from a spreadsheet, or let Plan Read find them on a site plan; each structure's stack of precast pieces is derived and priced from your own catalog and price list.
Written for: Estimator, Sales.
Watch the Isa Takeoff video ยท Download this guide as a PDF
In this guide
- Start a takeoff Quote Takeoff is where a job's structures become a priced quote. Check its settings before you add lines, so every line is priced and measured the way you expect.
- Add structures by hand Type each structure from the plans: its mark, its code or size, its elevations and its top. The takeoff works out the stack of precast pieces and prices it as you go.
- Review the materials and add other items Check the precast pieces the takeoff needs, and add anything that is not a structure, such as catalogue parts or typed items, so the total is complete.
- Read and print the quote The Quote tab shows the same takeoff the way the customer will see it, ready to print.
- Import structures from a spreadsheet When someone has already listed the structures in Excel or a CSV file, import them instead of typing them.
- Save a takeoff and open it again Saving stores the takeoff as a quote you can come back to, change and save again.
- Look at a saved takeoff without changing it Opened from its record, a saved takeoff is shown read only, so it can be checked without any risk of changing it.
- Read a site plan Plan Read reads a site plan PDF and finds its structures, with their rim, invert and pipe values, so you do not have to type them.
- Review and sign off the structures found Nothing read from a plan is used until a person has checked it. Review each structure against the plan, fill in what the plan does not print, and sign it off.
- Send the reviewed structures to Quote Takeoff Ready structures become lines in Quote Takeoff, where they are matched to your catalog and priced.
Glossary
- Takeoff
- The list of structures on a job, with each one's size, elevations and top.
- Derived stack
- The precast pieces a structure needs, worked out from its size, depth and top.
- Rim and invert
- The elevation of the top of a structure and of the lowest pipe flowline in it.
- Scope
- Whether a structure is new, existing, to be removed, adjusted, temporary or retained.
- Sign off
- A person's statement that a structure read from a plan has been checked and is ready to send.