IntraSync docs

Isa Takeoff: how-to guide

Isa Takeoff turns a prospective job into a priced quote in minutes. Type the structures in, import them from a spreadsheet, or let Plan Read find them on a site plan; each structure's stack of precast pieces is derived and priced from your own catalog and price list.

Written for: Estimator, Sales.

Watch the Isa Takeoff video ยท Download this guide as a PDF

In this guide

  1. Start a takeoff Quote Takeoff is where a job's structures become a priced quote. Check its settings before you add lines, so every line is priced and measured the way you expect.
  2. Add structures by hand Type each structure from the plans: its mark, its code or size, its elevations and its top. The takeoff works out the stack of precast pieces and prices it as you go.
  3. Review the materials and add other items Check the precast pieces the takeoff needs, and add anything that is not a structure, such as catalogue parts or typed items, so the total is complete.
  4. Read and print the quote The Quote tab shows the same takeoff the way the customer will see it, ready to print.
  5. Import structures from a spreadsheet When someone has already listed the structures in Excel or a CSV file, import them instead of typing them.
  6. Save a takeoff and open it again Saving stores the takeoff as a quote you can come back to, change and save again.
  7. Look at a saved takeoff without changing it Opened from its record, a saved takeoff is shown read only, so it can be checked without any risk of changing it.
  8. Read a site plan Plan Read reads a site plan PDF and finds its structures, with their rim, invert and pipe values, so you do not have to type them.
  9. Review and sign off the structures found Nothing read from a plan is used until a person has checked it. Review each structure against the plan, fill in what the plan does not print, and sign it off.
  10. Send the reviewed structures to Quote Takeoff Ready structures become lines in Quote Takeoff, where they are matched to your catalog and priced.

Glossary

Takeoff
The list of structures on a job, with each one's size, elevations and top.
Derived stack
The precast pieces a structure needs, worked out from its size, depth and top.
Rim and invert
The elevation of the top of a structure and of the lowest pipe flowline in it.
Scope
Whether a structure is new, existing, to be removed, adjusted, temporary or retained.
Sign off
A person's statement that a structure read from a plan has been checked and is ready to send.