IntraSync docs

Engineering: how-to guide

Engineering runs the plant's engineering department: shop drawings and design calcs from in-house drafters and outside firms, their review with the contractor, and the engineering release production checks before it releases a job. The internal engineer works the queue and signs releases; managers and coordinators assign jobs, follow submittals and keep the firms and checklists set up.

Written for: Internal engineer, Engineering manager, Drafting coordinator, Production planner, Administrator.

Watch the Engineering video ยท Download this guide as a PDF

In this guide

  1. Find your way around the Engineering hub Know where each list lives and where the everyday actions are, before you start work.
  2. Work the internal engineer's queue See every submittal waiting on the internal engineer and open one to act on it.
  3. Fill a checklist from the job's own documents Check off the checklist lines the job's documents already answer, without hunting for the files by hand.
  4. Check off checklist items Record, item by item, what the firm's package brought back before the submittal moves on.
  5. Find a submittal Get to any submittal quickly, whatever stage it is in.
  6. See who each submittal is waiting on Know whose court the ball is in, how long it has waited and which submittals have been escalated.
  7. Add a firm's revision Record the firm's updated drawings as a new revision and send it back for review.
  8. Move a submittal through review Record each review step, including the contractor's verdict, so the timeline always shows where the submittal stands.
  9. Put a submittal on hold, and clear the hold Stop a submittal from being released while something outside engineering is unresolved, and say why.
  10. Change the reviewer and backup Choose who signs the engineering release, and who can sign in their place.
  11. Sign the engineering release Sign off a submittal's final revision so production knows the job is released by engineering.
  12. Review the release log and reopen a released submittal See every signoff, and send a released design back for revision when something changes.
  13. Share a submittal's documents with a firm Give an outside firm the drawings sent to it, and a place to upload its own, without an account.
  14. Track jobs on the Assignments tab See every job assigned to a firm, its latest submittal and the release status production checks.
  15. Link a job to its sales order Tie the job to the order it is for, so other parts of the system can ask about that order's engineering status.
  16. Assign a new job to a firm Start engineering work on a job by assigning it to an in-house drafter or an outside firm.
  17. File a new submittal against a job Start a drawing package for a job, with the checklists the firm will be asked to answer.
  18. See due and late work on the calendar Plan the week and catch late drawings and jobs.
  19. Answer differences between the drawing and the order Make sure what is ordered matches what engineering approved, or record why it may differ.
  20. Review draft bills of materials Check and accept the bills of materials drafted for products that have none yet.
  21. Search engineering records Jump straight to a submittal, job or firm from anywhere in the hub.
  22. Set up engineering firms Keep the list of outside firms and in-house drafters that jobs are assigned to.
  23. Set up pre-submission checklists Decide what a firm is asked for before and after it sends its package, per structure type.
  24. Check the release gate See each job's release status as production reads it, and what is holding a job back.
  25. Set up BOM rules Add the components every matching product needs to new BOM drafts.

Glossary

Submittal
A drawing package for a job, sent through review in one or more revisions.
Revision
One version of a submittal's drawings. Revisions stack; none is overwritten.
Engineering release
The signoff on a final revision that tells production the job is released by engineering.
Release gate
An opt-in rule for a job: its release waits for every required checklist item and for any hold to clear.
Hold
A block on a submittal, with a reason, that keeps its job's release status at Blocked.