Yard Management keeps the record of the finished-goods yard: a to-scale map of its cells, where every piece sits, every move and every truck through the gate, and the tasks waiting to be done. Yard staff use it every day to receive, place, find and move pieces, and administrators set up the yards, zones and asset types it runs on.

Written for: Yard manager, Yard hand, Gate clerk, Yard administrator.

Watch the Yard Management video ยท Download this guide as a PDF

In this guide

  1. Find your way around Yard Management Yard Management keeps the record of the finished-goods yard: where every piece sits, how it moved, what came through the gate and what work is waiting. Start here to learn where everything is.
  2. Create a yard layout A layout is a to-scale drawing of the yard, divided into cells. Pieces are placed in cells, so a layout comes first.
  3. Add cells to a layout A cell is a place in the yard, such as a row or a bay, that holds pieces. Roads, forms and equipment areas can be drawn too, for reference.
  4. Generate a grid of cells Lay out evenly spaced rows and bays in one step, instead of adding each cell by hand.
  5. Change or remove a cell Correct a cell's name, capacity, size or area type, or take it off the layout.
  6. Make a layout the active one The active layout is the yard as it stands today. The Operations map, Unassigned assets and Cell capacity all work on it.
  7. Split a row into sections Divide a long row into named parts, such as the end nearest the road, so the yard can count what is in each part and suggest where a piece should go.
  8. List what goes in each section of a row Say which products each section of a row holds, so anyone can see what belongs there and how many of each are in place.
  9. Read the yard map See where everything is: the active layout as a map, cell by cell.
  10. Look at a row from above See a row as it lies in the yard: its sections in order, what is in place in each, and how a forklift reaches it from the road.
  11. Record forklift access along a row's long sides Most rows are worked from the top or the bottom rather than from an end. Record which sides a forklift uses, so the Sky view draws the roads it really comes in from.
  12. Look at one section from above See one section on its own, with a place for each product it lists, to find where every piece of each product sits.
  13. Draw a section's close-up as lanes Set how a section's View draws it, the way the yard is laid out on the ground: lanes from one road to the other, each as wide as the pieces in it, with one product to a lane or two products sharing a lane with eco blocks between them.
  14. Read a section's close-up at a glance Keep each product's box in a section's View simple: its name, what is good to ship, and what needs attention.
  15. Receive pieces from production Bring finished pieces into the yard record as they arrive from production, placing them in a cell in the same step.
  16. Place a piece in a cell Record where a piece sits, so anyone can find it.
  17. Place several unassigned assets at once Find every asset that has no cell on the active layout, and place several of them in one go.
  18. Move a piece to another cell Keep the yard record right when a piece is moved.
  19. Take a piece out of its cell Return a piece to the unassigned list when it has left its cell but not gone into another one.
  20. Check how full each cell is Spot full and empty cells before deciding where pieces go.
  21. Find and filter assets Narrow the yard's assets to the ones you are looking for, and take the list away as a spreadsheet.
  22. Look up an asset's history See everything the yard knows about one asset: where it is, how it moved, when it passed the gate and which tasks it has had.
  23. Add or change an asset Add something the yard holds that is not already listed, or correct an asset's details.
  24. Record a movement Record a move inside the yard, so the history of every asset stays complete.
  25. Reverse a movement Put right a movement that was recorded by mistake, while keeping the original on record.
  26. Log a truck in or out at the gate Record every arrival and departure through the yard gate.
  27. Correct a gate event Put right a gate event that was recorded wrongly, while keeping the original on record.
  28. Create a yard task Ask for work to be done on an asset, such as relocating, loading, unloading or inspecting it.
  29. Start, complete or cancel a task Keep the task list true to what is happening in the yard.
  30. Search the whole yard Find anything in the yard from one box, wherever you are in Yard Management.
  31. Review second-grade stock See every piece quality control graded second, and where each one is.
  32. See a piece's quality control state Check whether a piece is cleared, held or graded second before you load it.
  33. Report damage to quality control Tell quality control about damage found in the yard, so the piece is held and does not ship.
  34. Flag a piece as number two Tell quality control that a sound piece is not as ordered, so it can be graded second.
  35. Replace a lost or damaged tag Get a piece's tag reprinted, or a new one issued, when it can no longer be scanned.
  36. Trash a piece Take a piece that cannot be used out of the yard, with the reason on record, so anyone looking for it later can see it was trashed.
  37. Put back or dispose of a trashed piece Review every trashed piece, return one to the yard, or remove one for good.
  38. See your own system's status on yard assets Where your company's own system keeps a status for each piece, see it beside the yard's own information.
  39. Manage asset types Keep the catalog of asset kinds the yard stores, with their standard sizes and how they stack.
  40. Manage yards Add the yards your company runs and say which are in service.
  41. Manage zones and location slots Divide each yard into zones, and give each zone the location slots the Tasks and Movements tabs record against.
  42. Review every layout See all of the yard's layouts in one list and check that exactly one is active.
  43. Look up carriers, drivers, vehicles and manifests Check the carriers, drivers, vehicles and manifests the gate log refers to.
  44. Review the yard before going live Before the yard goes live, check how its workflow is set up, what is still missing, and record who signed it off.

Glossary

Layout
A to-scale drawing of the yard, divided into cells.
Active layout
The one layout the yard uses today. The Operations map and the header tools work on it.
Cell
A place on a layout, such as a row or a bay, that holds pieces; or an area such as a road, drawn for reference.
Section
A named part of a row, used to count what is in it and to suggest where a piece goes.
Sky view
A drawing of a row, or of one of its sections, as seen from above.
Asset
Anything the yard tracks by its tag: a precast piece, a container, a pallet or a trailer.
Unassigned
An asset with no cell on the active layout.
Zone and location slot
Named areas of a yard and the addresses inside them that tasks and movements record against.
Movement
A permanent record of an asset moving from one slot to another.
Gate event
A permanent record of an arrival or departure through the yard gate.
Correction row
The record that puts a mistaken movement or gate event right. The original stays, struck through.
Number two, second grade
A sound piece that is not as ordered, graded second by quality control.